| Bangor Fire Station #6 |
| City of Bangor |
| Barr & Barr |
| Bangor, Maine |
| Firestone/Una-Clad |
|
| The 10,300 Sq Ft standing seam metal roof system was installed using 24 ga base metal with a Sierra Tan Kynar 500 finish. To meet the GC's schedule, the project took place through the winter months. Roof Systems of Maine used mobile pan-forming equipment to fabricate and install the double-lock standing seam roof. The barrel-roof entrance added to the complexity of the installation, as did the vertical siding at the arched front parapet and at curtain wall locations around the building. |
|
|
|
|
 |
| Brewer Public Safety Building |
| City of Brewer |
| Nickerson & O'Day |
| Brewer, Maine |
| Peterson Aluminum Co PAC-Clad |
|
| Forest Green was the chosen finish for the standing seam metal roof on the Administration Wing. The vertical, flat seam panels at the fin walls were shop-fabricated using a custom color to closley match the brick. Una-Clad Sierra Tan parapet caps completed the tri-color scheme. Lastly, Snow Management 2-pipe snowguards were installed to prevent sliding snow from reachng the walkways below. |
|
|
|
|
 |
| Northeast Cardiology |
| NECA |
| Revere 16oz Lead Coated Copper |
|
| Roof Systems of Maine installed the barrel-style standing seam metal roof system on this Bangor facility using 16 oz lead-coated copper coil stock. Once the roof panels were formed, they were run thru on-site radius-forming equipment. LCC was used throughout the project to trim out canopies and other curved metal profiles. |
|
|
|
|
 |
|